Takeda at Lexington Technology Park

SMMA was first introduced to the Lexington Technology Park campus in 2002, when our client, Atlantic Management, acquired the 95-acre property from Raytheon Corporation. From SMMA’s first site visit, we recognized the scope and importance of the property: It served as a global headquarters to Raytheon, and although the landscape and the buildings were of a different era, they were unique.  

SMMA and Atlantic Management master planned one million square feet of life science space, securing both state and town agencies' approval. Our primary goal was to allow flexibility for future life science tenants, but within the development envelopes' constraints, to protect open space. One particular exercise involved studying the characteristics of the drainage patterns existent before any commercial development of the property, which had begun circa 1955 and subsequently designing infrastructure to recreate the pre-development water quality and quantities. The ultimate stormwater-management goal in 1955 remained unchanged in 2015: Protect the downstream water supply in the Hobbs Brook Reservoir. 

In 2005, Shire signed its first lease at Lexington Tech Park. SMMA was retained directly by Shire, marking the beginning of our decade-long relationship and continuing our design services for Atlantic Management.

Permitting at Lexington Technology Park

2002

SMMA assists Patriot Partners with the acquisition and master planning of the former Raytheon property

2004

Town Meeting approves re-zoning of land to a planned commercial district to include life science and manufacturing uses

2007

Shire moves to the site.

SMMA leads several permitting efforts for ongoing and future development, including: 

  • Filing an environmental notification form with the Massachusetts Executive Office of Energy and Environmental Affairs under the Massachusetts Environmental Policy Act for the expansion of the Park to 630,000 square feet of building space—includes a review of stormwater design, wetland resources, water supply, wastewater, traffic impacts, and historical assets 
  • Filing with the Zoning Board of Appeals for a special permit and site plan approval for the construction of 400 Shire Way, a 212,000 sf pharmaceutical manufacturing and office building, and definitive site development and use plan to demonstrate conformance with the preliminary site development and use plan approved at Town Meeting in 2004 
  • Filing a notice of intent with the Conservation Commission and the Massachusetts Department of Environmental Protection for the proposed development of 400 Shire Way and the future development of 200 and 300 Shire Way 
2009

Lexington Town Meeting approves another expansion of the Park, increasing building space to 1,076,600 square feet

2010

Shire purchases the campus 

SMMA has performed numerous civil and landscape work throughout Shire’s campus, including:

  • A new primary electric-service infrastructure project, over 200 feet in length that included filing a notice of intent with the Conservation Commission 
  • A site lighting and walkway project that included filing a request for determination with the Conservation Commission 
  • An upgrade of pre-existing parking for ADA/MAAB compliance 
  • Zoning Board of Appeals permitting and site design for microbulk tank containment at 125 Spring Street 
  • Assistance with the design and execution of 35+ acres of restricted conservation space 
  • Continued consulting for various projects and proposals for development 